- Dec 14, 2012
-
-
Chris Reed authored
Without this patch, use of sched/builtin would always result in FIFO scheduling, even if priority/multifactor was configured
-
Danny Auble authored
-
Danny Auble authored
-
- Dec 13, 2012
-
-
Danny Auble authored
since that will only waste time (anything * 1 = anything)
-
jette authored
-
Danny Auble authored
-
Danny Auble authored
each block independently.
-
Danny Auble authored
-
- Dec 12, 2012
-
-
Danny Auble authored
-
Danny Auble authored
-
Danny Auble authored
-
Danny Auble authored
-
Danny Auble authored
-
Morris Jette authored
-
Morris Jette authored
-
Morris Jette authored
Conflicts: META NEWS
-
Morris Jette authored
-
- Dec 11, 2012
-
-
Morris Jette authored
-
- Dec 10, 2012
-
-
Morris Jette authored
-
Morris Jette authored
-
Morris Jette authored
-
Morris Jette authored
-
- Dec 07, 2012
-
-
Morris Jette authored
-
Morris Jette authored
-
Morris Jette authored
Correction to hostlist sorting for hostnames that contain two numeric components and the first numeric component has various sizes (e.g. "rack9blade1" should come before "rack10blade1")
-
Morris Jette authored
-
Danny Auble authored
-
Morris Jette authored
-
Danny Auble authored
-
Morris Jette authored
-
Yiannis Georgiou authored
-
Morris Jette authored
-
- Dec 06, 2012
-
-
Danny Auble authored
-
Danny Auble authored
-
Danny Auble authored
-
Morris Jette authored
-
Morris Jette authored
-
Morris Jette authored
Previously the job would be accepted at job submit time if nodes required for its use (e.g. in a required node list or the node count) could not be satisfied at submit time due to an advanced reservation. Bug #187
-
Morris Jette authored
-
Danny Auble authored
-