Minor tweak to scheduler cycle timing
Decrease maximimum scheduler main loop run time from 10 secs to 4 secs for improved performance. If running with sched/backfill, do not run through all jobs on periodic scheduling loop, but only the default depth. The backfill scheduler can go through more jobs anyway due to its ability to relinquish and recover locks. See bug 616
Loading
Please register or sign in to comment