Skip to content
Snippets Groups Projects
Commit 547d1a69 authored by Moe Jette's avatar Moe Jette
Browse files

Add "update part maxtime" description

parent c63d4cc0
No related branches found
No related tags found
No related merge requests found
.TH SCONTROL "1" "December 2006" "scontrol 1.2" "Slurm components" .TH SCONTROL "1" "March 2007" "scontrol 1.2" "Slurm components"
.SH "NAME" .SH "NAME"
scontrol \- Used view and modify Slurm configuration and state. scontrol \- Used view and modify Slurm configuration and state.
...@@ -404,6 +404,18 @@ Hidden partitions will by default not be reported by SLURM APIs ...@@ -404,6 +404,18 @@ Hidden partitions will by default not be reported by SLURM APIs
or commands. or commands.
Possible values are"YES" and "NO". Possible values are"YES" and "NO".
.TP .TP
\fIMaxNodes\fP=<count>
Set the maximum number of nodes which will be allocated to any single job
in the partition. Specify a number or "INFINITE".
.TP
\fIMaxTime\fP=<minutes>
Set the maximum run time for a jobs in minutes.
Specify a number or "INFINITE"
.TP
\fIMinNodes\fP=<count>
Set the minimum number of nodes which will be allocated to any single job
in the partition.
.TP
\fINodes\fP=<name> \fINodes\fP=<name>
Identify the node(s) to be associated with this partition. Multiple node names Identify the node(s) to be associated with this partition. Multiple node names
may be specified using simple node range expressions (e.g. "lx[10\-20]"). may be specified using simple node range expressions (e.g. "lx[10\-20]").
...@@ -429,14 +441,6 @@ If a partition allocated nodes to running jobs, those jobs will continue ...@@ -429,14 +441,6 @@ If a partition allocated nodes to running jobs, those jobs will continue
execution even after the partition's state is set to "DOWN". The jobs execution even after the partition's state is set to "DOWN". The jobs
must be explicitly canceled to force their termination. must be explicitly canceled to force their termination.
.TP .TP
\fIMaxNodes\fP=<count>
Set the maximum number of nodes which will be allocated to any single job
in the partition. Specify a number or "INFINITE".
.TP
\fIMinNodes\fP=<count>
Set the minimum number of nodes which will be allocated to any single job
in the partition.
.TP
\fBSPECIFICATIONS FOR UPDATE, BLOCK \fR \fBSPECIFICATIONS FOR UPDATE, BLOCK \fR
.TP .TP
Bluegene systems only! Bluegene systems only!
......
0% Loading or .
You are about to add 0 people to the discussion. Proceed with caution.
Finish editing this message first!
Please register or to comment