sched/backfill: restore original job time limit
A job being considered for backfill scheduling can have its time limit altered to the partition limit, job minimum time limit, etc. This fixes two places where the backfill scheduler could leave the job in a pending state with a time limit different from it's original value.
Loading
Please register or sign in to comment